5.3L Engine Rebuild Page 37

Figure 145
Figure 145

Figure 145. The alternator/power steering pump bracket was also powdercoated at the same time as the oil pan, it was also re-installed. The stock M10 x 113mm bolts are ugly and will be replaced with M10 x 110mm black bolts, either socket head or flange hex head, whichever can be found economically. The 3mm difference does not matter as the first 3mm of the stock bolts are not threaded at all.

Figure 146
Figure 146

Figure 146. Installation of the Trick Flow 4-corner steam vent kit was begun. According to the installation instructions, the tee going to the radiator is usually on the drivers side, but with the truck bracket in the way, it will have to be installed on the passenger side. that will be good because the hose can then be run alongside the upper water pump hose and attached to it with cable ties for a cleaner installation. This kit has a hose connection at all four corners which will help to eliminate hot spots in the cooling system.

Figure 147
Figure 147

Figure 147. Installed the transmission onto the engine. There are six M10 bolts, torqued to 37ft lbs. The engine was put on Motofeet stands so that the transmission could be attached. These stands also have steel casters. They work, but with the weight, it still is not easy to move around. Mechanically this engine is now complete. The wiring harness necessitated the transmission being put on as individual harnesses for it are also incorporated into the wiring, and it is very difficult to gauge length with the unit not bolted on. Harness completion will be the final step before this is placed into the Jeep.

Figure 148
Figure 148

Figure 148. Here are the new spark plug wires installed on the driver side. These are the MSD wires for the 8.1L. They are the perfect length for the coil packs mounted on the ProForm brackets. They also come with a heat shield already installed, very nice!


 
 